|
|
| Welcome, Guest |
|
|
|
Available Corrigendum |
|
|
|
Search Corrigendum |
Back to tenders
|
|
|
|
|
|
|
|
Please
Click on the Tender No. to see more details. You must login to download the
tenders.
New Users can
Register
here. |
| |
|
Tender No |
Description |
Issue Date |
Opening Date |
Corrigendum |
|
CE/CON/SUR/FLS/2025/02 |
Conducting Final Location Survey (FLS) for (i) New BG Railway Line Projects (Appx. Length equal to 900.00 km), (ii) Gauge Conversion/Doubling/ Third line/ 3rd and 4th line (Appx. Length equal to 600.00 km.) of various projects in India, Nepal and Bangladesh (iii) Preliminary Engineering cum Traffic Survey from Gangtok to Nathula (Appx. Length equal to 240.00 km) in the State Sikkim with Geo-Technical Investigation. Preparing FIRR/EIRR, EPC document and submission of DPR etc. as per Railway Board's latest guide lines complete in all respect |
6/2/2026 |
20/2/2026 3:30:00 PM |
1) 01 Dated: 13/1/2026
|
|
CE/CON/AK/PMS/2025/06 |
"Providing project management services Engineering, Procurement and Construction (EPC) contracts and other works contracts ( Item rate contracts) for Doubling Project between Agthori station (km 393.380) to Kamakhya station (km 401.120) including Construction of 2nd rail cum road bridge over river Brahmaputra including viaduct, retaining walls, embankment and minor bridges including track work, OHE work, signaling and telecom work and general work in connection with Agthori - Kamakhya doubling project of Northeast Frontier Railway in the state of Assam." and "Engineering, Procurement and Construction (EPC) contracts and other works contracts (Item rate contracts) for Doubling of Track between Azara (163.000 km) (including) and Kamakhya stations (including)up to km 176.000 (13 km) including Electrification and Signalling works in connectionwith New Bongaigaon -Goalpara Town - Kamakhya doubling project of Northeast Frontier Railway." |
28/1/2026 |
11/2/2026 3:30:00 PM |
1) 01 Dated: 13/1/2026
|
|
CE/CON/KK/EPC/2025/07 |
RFP for Engineering, Procurement and Construction (EPC) contract Agreement for Balance work of Construction of Sub-Structure and Super-structure of Major Bridge No. 5 (5X12.2M - PSC Slab at Ch.13.400 km), Bridge No. 9 (3x12.2 -PSC Slab at Ch 20.602 km), Bridge No. 10 (5x12.2M - PSC Slab at Ch. 22.455 Km), Bridge No.12 (5x12.20M - PSC Slab at Ch. 28.065 Km ) and Important Br. No. 11 (8x45.7M - OWG at Ch. 25.470 Km ) and construction of Sub-structure of Bridge No. 6 (1x30.50M - OWG at Ch. 15.665Km), Construction of Sub-Structure and Super-structure of Bridge No. 7 (7x12.2M -PSC Slab at Ch. 17.855 Km) and Bridge No. 8 (4x12.2M -PSC Slab at Ch.19.035 Km), including protection work, guidebund, making Embankment in approaches of Bridge and other related bridge works in KATIHAR (KIR)- KUMEDPUR (KDPR) Railway BG Doubling project of NF Railway (construction) on EPC mode. |
8/1/2026 |
28/1/2026 3:30:00 PM |
1) 01 Dated: 1/1/2026
|
|
CE/CON/DK/EPC/2025/06 |
RFP for Engineering, Procurement and Construction (EPC) contract Agreement for "Construction of Sub Structure in RCC & Super Structure in composite girder for via duct ( 14 X 30.5) at Pherima yard and other ancillary works in connection with Dimapur (Dansiri) - Kohima (Zubza) New BG line Project. |
8/1/2026 |
28/1/2026 2:30:00 PM |
1) 01 Dated: 31/12/2025 2) 02 Dated: 31/12/2025
|
|
CE/CON/DK/EPC/2025/06 |
RFP for Engineering, Procurement and Construction (EPC) contract Agreement for "Construction of Sub Structure in RCC & Super Structure in composite girder for via duct ( 14 X 30.5) at Pherima yard and other ancillary works in connection with Dimapur (Dansiri) - Kohima (Zubza) New BG line Project. |
8/1/2026 |
28/1/2026 2:30:00 PM |
1) 01 Dated: 31/12/2025 2) 02 Dated: 31/12/2025
|
|
|
|
|
|
|
|
First : Previous [ 1 ] Next : Last |
|
|