Back to Home Page

   
 

Available Tenders

 
 Search Tenders

View Store Tenders

Corrigendum

 
  Unit Location  
Department  
  Opening Date       (DD/MM/YYYY)  
  Tender No.
 

 Please Click on the Tender No. to see more details. You must login to download the tenders.
New Users can
Register here.

 

 Tender No

  Description

 Issue Date  

Receipt of Offer up to

Opening Date

Corrigendum

CE/CON/N-J/PA/2022/09

Balance work for construction of high level passenger platforms at Chapar, Bechimari & Abhayapuri station yard, PP shed at Gauripur (2 bay) & Abhayapuri (6 bay), FOB at Bechimari & Abhayapuri station and other ancillary works in connection with construction of new B. G. line from NMX (W.B.) to JPZ (Assam).

29/11/2022

13/12/2022

13/12/2022 3:30:00 PM

Nil

CE/CON/AS/MIS/2022/08

At Sabroom- construction of Goods Approach road along with side drain, toe Wall, retaining wall and a Road Bridge (Span:-1x6.00m) to connect the Goods circulating Area to NH-44 via Newly constructed PWD Road at Sabroom in connection with Agartala-Sabroom new BG Line Project.

23/11/2022

07/12/2022

07/12/2022 3:30:00 PM

Nil

CE/CON/A-G/BLS/2022/17

Manufacturing and supplying of 50 mm size of Pakur variety machine crushed stone ballast of approved quality from quarry Pakur/ Talijhari/ Bakudi/ Sahibganj/ Pinergaria and stacking the same within Railway boundary all along the section in between stations Teragachh (excluding) and Thakurganj from Ch: Km 58.50 to Km 106.96 in connection with Arariya - Galgalia new BG line project of N. F. Railway.

22/11/2022

06/12/2022

06/12/2022 3:30:00 PM

Nil

CE/CON/A-G/BLS/2022/18

Manufacturing and supply of 50mm size Pakur variety machine crushed stone ballast of approved quality from quarry Pakur / Talijhari/ Bakudi/ Sahibganj/ Pinergaria and stacking the same within railway boundry adjacent to the existing Railway embankment all along the section in between stations Araria Court and Teragachh from Ch: Km 0.00 to Km 58.500 & in between station Araria and Rahmatpur of Y-connection in connection with construction of new BG line from Arariya to Galgalia of N. F. Railway (Construction).

22/11/2022

06/12/2022

06/12/2022 3:30:00 PM

Nil

ELC-MLG-06-2022-23-NBQ-KYQ

Illumination of passenger circulating area, goods circulating area and other service building etc. by High Mast Tower lighting & Wiring and electrification of staff’s quarter and other project related works as under NBQ-KYQ via GLPT DB Project.

15/11/2022

05/12/2022

05/12/2022 3:00:00 PM

Nil

EL-C-MLG-01-RE-22-2023-KYQ

Design, supply, erection, testing & commissioning of 25 KV, 50 HZ, Sigle Phase, AC electrification OHE works in connection with Yard remodeling and extension of Kamakhya station.

07/11/2022

05/12/2022

05/12/2022 3:00:00 PM

Nil

EL-C-11-2021-22-DMV-Kohima

Electrification and illumination of Molvom station building, PP shed, Platform lighting, FOB lighting, Staff Qrs, Passenger circulating area, approach road in between Sukhovi-Zubza Railway stations in connection with DMV-Kohima new BG line Project.

07/11/2022

05/12/2022

05/12/2022 3:00:00 PM

Nil

CE/CON/AG/CRG/2022/13

Carriage of various P. Way Materials for the unit of Dy.CE/CON/KIR, NF Railway from different location to mid of the section ARR- Terragach in connection with construction of new BG line from Arariya to Galgalia of N.F. Railway (Construction) in between stations Araria Court and Teragachh from Ch. Km 0.00 to Km 58.500 and in between station Araria and Rahmatpur of Y- Connection.

18/11/2022

02/12/2022

02/12/2022 3:30:00 PM

Nil

CE/CON/AG/TL/2022/09

Linking of new BG track on PSC sleeper manually including auxiliary track and TRR by 10/20 rail panel, linking of Points & Xing, SEJ, L-Xing, insertion of pre-assembled turnout, carriage of sleepers & rails, spreading of ballast etc. and all other connected ancillary works as per requirement in between stations Teragachh (excluding) and Thakurganj from Ch:Km 58.50 to Km 106.96 in connection with Arariya - Galgalia new BG line project of N. F. Raiway.

18/11/2022

02/12/2022

02/12/2022 3:30:00 PM

Nil

CE/CON/AG/TL/2022/15

Linking of new BG track on PSC sleeper manually including auxiliary track and TRR by 10/20 rail panel, linking of Points & Xing, SEJ, L-Xing, insertion of pre-assembled turnout, carriage of sleepers & rails, spreading of ballast etc. and all other connected ancillary works as per requirement in between stations Arariya and Teragachh from Ch: Km 0.00 to Km 58.500 & Y- leg connection Arariya and Rahamatpur in connection with Arariya - Galgalia new BG line project of N. F. Railway

18/11/2022

02/12/2022

02/12/2022 3:30:00 PM

Nil

CE/CON/A-G/MB/2022/10/RT-1

Construction of super structure of new major bridges Br No. 100 (158) (3x45.70m, OWG at Ch. 59523.00), Br No.106 (164) (2 x 45.70m, OWG at Ch. 62123.00),Br No. New (166) (19 x 45.70m, OWG at Ch. 63133.00),Br No. New (170) (1 x 30.50m, OWG at Ch. 64253.00),Br No. 113 (172) (2 x 45.70m, OWG at Ch. 64994.00),Br No. 121 (179) (3 x 45.70m, OWG at Ch. 68083.00),Br No. 129 (187) (2 x 18.30m, Composite Girder at Ch. 70583.00),Br No. 134 (192) (4 x 18.30m, Composite Girder at Ch. 72203.00),Br No. 136 (194) (1 x 18.30m, Composite Girder at Ch.72903.00), Br No. 141 (199) (3 x 30.50m, Composite Girder at Ch.750430.00),Br No. 142 (200) (3 x 30.50m, Composite Girder at Ch. 75723.00),Br No. 147 (205) (2 x 18.30m, Composite Girder at Ch. 77947.00), Br No. 148 (206) (2 x 18.30m, Composite Girder at Ch. 78073.00),Br No. 153(210) (3 x 30.50m, Composite Girder at Ch. 79203.00),Br No. 157 (214) (2 x 30.50m, Composite Girder at Ch. 80533.00), Br No. 165 (222) (5 x 30.50m, OWG at Ch. 83513.00),Br No. 175 (233) (3 x 24.40m, Composite Girder at Ch. 87450.00), Br No. 185 (242) (4 x 24.40m, Composite Girder at Ch. 91545.00), Br No. 190A (248)RUB (1 x 30.50m OWG at Ch. 93981.00), Br No 206(264) (1x18.30m, Composite Girder at Ch. 100797.00), Br No. 207 (265)(3 x 24.40m, Composite Girder at Ch. 100990.00) & Br No. 212(269) RUB (2 x 30.5m, Composite Girder at Ch. 103172.00) and other ancillary works between Chainage 58.50 km to 106.84 km in connection with Araria - Galgalia new BG line project of N. F. Railway.

17/11/2022

01/12/2022

01/12/2022 3:30:00 PM

Nil

CE/CON/A-G/MB/2022/11/RT-1

Construction of super structure of new major Bridge No 5(1X 30.50m Composite Girder at Ch- 1840.00 ),Bridge No 6( 2x24.4 m Composite Girder at Ch- 2070.00 ), Bridge No 6-B( 1X18.3 m Composite Girder at Ch- 2200.00 ), Bridge No 7(3X 30.5m Composite Girder at Ch- 2600.00 ),Bridge No 11(1 x 61.0m Steel Through Girder at Ch 4750.00),Bridge No 12( 2x45.7m Steel Through Girder at Ch 5160.00), Bridge No 14(2X 30.50m Composite Girder at Ch- 5840.00 ),Bridge No 18(1X18.30m Composite Girder at Ch- 7345.00 ),Bridge No 27(2X 30.50m Composite Girder at Ch- 10275.00 ),Bridge No 28(2X 30.50m Composite Girder at Ch- 10795.00 ), Bridge No 31(2x 30.5m OWG at Ch- 11585.00 ),Bridge No 32(1x24.4m Composite Girder at Ch- 11825.00 ) ,Bridge No 39(1 x 18.3m Composite Girder at Ch 14315.00),Bridge No 40(3 x 30.50 Composite Girder at Ch 14695.00),Bridge No 51(3X 30.50m OWG at Ch- 18535.00 ),Bridge No 56(1X 45.70m OWG at Ch- 21100.00 ), Bridge No 70(1X 45.70m OWG at Ch- 26478.00 ), Bridge No 77 (1X18.3 m Composite Girder at Ch- 29033.00 ),Bridge No 79(1X 30.50m Composite Girder at Ch-29929.00 ), Bridge No 90(2X 45.70m OWG at Ch- 34858.00 ), Bridge No 94(1X 30.50m OWG at Ch- 36558.00),Bridge No 102(2X 30.50m OWG at Ch- 39398.00 ),Bridge No 109(2X 30.50m Composite Girder at Ch- 43176.00 ), Bridge No 115(1X 30.5m Composite Girder at Ch- 45455.00 ), Bridge No 121(2X 30.50m Composite Girder at Ch- 47464.00 ), Bridge No 127(1X 18.30m Composite Girder at Ch-48625.00 ), Bridge No 143(5X 45.70m OWG at Ch- 54327.00 ) between Araria Court and Teragachh Halt and Bridge No 6A(1X 30.5m Composite Girder at Ch- 2325.00 ), Bridge No7A(1X 12.2m Composite Girder at Ch- 2625.00 ), BridgeNo 8A(3X 30.5m Composite Girder at Ch- 2985.00 ) between Arariya and Rahmatpur station of Y-Connection and other ancillary works in connection with Araria - Galgalia new BG line project of N. F. Railway (Construction).

17/11/2022

01/12/2022

01/12/2022 2:30:00 PM

Nil

CE/CON/T-B/TL/2022/10

Balance work of Track Linking with 60 / 52 Kg new rail on PSC sleepers (M+9) (M+7) density on main / Loop / siding line between Ch. 10.323 Km to Ch. 21.640 Km & Track Linking of proposed line no. 3, 4 & 5 at KMLJ yard in connection with Tetelia (Assam) - Byrnihat (Meghalaya) Project.

15/11/2022

29/11/2022

29/11/2022 3:30:00 PM

Nil

EL-C-MLG-16-21-22-NBQ-KYQ

Proposed works for Solar on-Grid vased 50Kw power roof top power plant at Abhyapuri and Goalpara Railway station in connection with NBQ-GLPT-KYQ doubling Project.

03/11/2022

28/11/2022

28/11/2022 3:00:00 PM

Nil

         

First : Previous [  1 ] Next : Last  

         
 

Powered by WebX