CE/CON/NK/EPC/2024/02 |
Construction of Viaduct (4.7 Km), Retaining Walls, Embankment and Minor Bridges for proposed Up and Down line to provide permanent mitigation measures in elephant corridors near Deepor Beel area, including Track work, OHE work, modification of Azara SSP and Signalling & Telecom work between station Azara and Kamakhya for commissioning of Azara- Kamakhya Section in connection with NBQ-GLPT-KYQ doubling project On Engineering, Procurement & Construction (Hybrid EPC) Mode. |
09/12/2024 |
23/12/2024
|
30/12/2024 4:00:00 PM |
Nil |
CE/CON/LTD/EPC/2024/09 |
Engineering, Procurement and Construction (EPC) contract Agreement for Doubling of Track between Dhansiri (Including) (km 241.000) to Naojan stations (Excluding) (km 285.860) (excluding) Dimapur yard from km 259.062 to km 260.782=1.72 Km) (Total Length- 43.140 Kms) including Electrification & Signaling works in connection with Lumding -Tinsukia Jn - Dibrugarh doubling project of Northeast Frontier Railway in the state of Assam. |
18/10/2024 |
01/11/2024
|
11/11/2024 3:30:00 PM |
1) 03 Dated: 18/09/2024 2) 02 Dated: 18/09/2024 3) 01 Dated: 18/09/2024
|