CE/CON/KK/MIS/2024/13 |
Earthwork in formation for railway BG embankment, blanketing work as per RDSO specification in revised alignment (Ch. 13.6 Km to 15.0 Km, Ch.-15.5 km to 17.8 km and 24.5 km to 27.9 Km), superstructure of Bridge No.-06 (OWG-1x30.5m), construction of RCC retaining wall and drain, protection work, 3 Nos of Gate goomty, 4 Nos of LOC huts, 2 Nos of OC huts, 3 Nos of auto huts; manufacturing, supplying & stacking of 50 mm size of machine crushed track ballast of approved quality conforming to latest RDSO Specifications within Railway boundary all along the section and yards as per requirement between stations Katihar (excluding) and Kumedpur (including) from Ch: Km 1.38 to Km 30.30 ; Linking of new BG track on PSC sleeper including auxiliary track, TRR by 10/20 rail panel, laying and linking of Points & Xings, SEJs, L-Xings, insertion of turnouts, carriage of material including sleepers & rails, spreading of ballast etc., modification of existing track of station section and all other connected works as per requirement in between stations Pranpur Road (excluding) to Kumedpur (including) from Ch: Km 19.70 to Km 30.30, and all other connected ancillary works of KIR-KDPR in connection with Katihar- Kumedpur doubling project of N. F. Railway (Construction). |
26/12/2024 |
09/01/2025
|
09/01/2025 3:30:00 PM |
Nil |
CE/CON/KM/MIS/2024/12 |
Earthwork in formation for railway BG embankment, blanketing work as per RDSO specification, construction of RUBs (1 Nos) along with protection works, construction of RCC retaining walls & drains, 1 Nos. B Class station Building (MFA),1 Nos Outer cabin,3 Nos level crossing gate gumties & 1 Nos D class station building (MNEP) with circulating area and high level passenger platforms, 2 nos. 3m wide FOBs and all other connected ancillary works between Km 24.00 to Km 35.540 including Cess Supply of ballast from Km 0.0 to Km 35.540 in connection with Katihar- Mukuria doubling project. |
24/12/2024 |
07/01/2025
|
07/01/2025 3:30:00 PM |
Nil |