Back to Home Page

   
 

Available Tenders

 
 Search Tenders

View Store Tenders

Corrigendum

 
  Unit Location  
Department  
  Opening Date       (DD/MM/YYYY)  
  Tender No.
 

 Please Click on the Tender No. to see more details. You must login to download the tenders.
New Users can
Register here.

 

 Tender No

  Description

 Issue Date  

Receipt of Offer up to

Opening Date

Corrigendum

CE/CON/AG/MIS/2023/16

Construction of Guide bund of Br no 222(5x30.5m, OWG) at km 83.535, guide bund of Br no 247(9x45.7m, OWG) at km 93.585, diversion of Indo Nepal border road 980m long (approx) along Railway embankment up to Br. No. 250 and other ancillary works in connection with Araria - Galgalia new BG line project of N. F. Railway.

06/11/2023

06/11/2023

06/11/2023 2:30:00 PM

Nil

CE/CON/NA/GCA/2023/06

Construction of Goods Circulating area, labour shed & goods approach road at Barpeta Road and other ancillary works in connection with NBQ-AGT BG Doubling project.

12/10/2023

26/10/2023

26/10/2023 3:30:00 PM

Nil

CE/CON/KM/DDC/SLT/2023/01

Name of work - Conducting Geotechnical investigation (along with preparation & submission of final report), developing bridge GADs, designing and developing detailed structural drawings for foundation, ubstructure, bearings, pedestal & bed block etc. for major/important bridges, Br. No. 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21 & 144 ( Total = 20 Nos.) along with submitting 5 set of hard copies and editable soft copies (with detailed design calculations) in connection with doubling work of KIR-MFA section.

02/10/2023

16/10/2023

16/10/2023 2:30:00 PM

Nil

CE/CON/B-S/PW/2023/04/RT1

Protection work of slopes in cutting and other ancilliary work under juridiction of DY.CE/CON/BHRB & DY.CE/CON/KAWNPUI in connection with the construction of new BG Railway line from Bairabi to Sairang (Mizoram) Project.

29/09/2023

13/10/2023

13/10/2023 3:30:00 PM

Nil

CE/CON/B-S/MIS/2023/03/RT1

Execution of Civil Engineering work for construction of Double storied Service building & maintenance shed for sick line, covered washing pit line shed, cat walk with water hydrant & pathway, Coach watering facility, Track machine staff office cum Rest house & siding Platform including electrical works at Sairang Yard and Goods office, FOIS, Merchant office & labour Rest Room at Mualkhang & Sairang Yard in connection with Bairabi-Sairang New BG Rail Line Project (Mizoram).

29/09/2023

13/10/2023

13/10/2023 3:30:00 PM

Nil

CE/CON/JT/PW/2023/05/RT1

Protection of high embankment and deep cutting and other ancillary works under the jurisdiction of Dy.CE/CON/JRBM between station JRBM-VNGP-Tunnel No. 1 in connection with construction of new BG Railway line from Jiribam to Tupul (Imphal).

26/09/2023

10/10/2023

10/10/2023 3:30:00 PM

Nil

CE/CON/AG/PW/2023/15

Construction of Guide bund of Br no 166, and other ancillary works in connection with Araria - Galgalia new BG line project of N. F. Railway.

25/09/2023

09/10/2023

09/10/2023 3:30:00 PM

Nil

CE/CON/BH/MB/2023/10

Balance work of Sub-structure and Superstrucure of major Bridge No. 4 (5x45.7 m OWG Through Welded Steel Girder at Ch - 1.385 km ), Bridge No. 16 (4x12.2m PSC Slab at Ch- 9.53 km ), Bridge No. 20 (3x12.2m Composite Girder at Ch - 14.508 km), Bridge No. 26 (3x12.2 m PSC slab at Ch - 20.185km) and Br No. 36 (3x45.72m OWG Through Welded Steel Girder at Ch. - 27.93 km) between Balurghat to Hili and other ancillary works in connection with new BG line project from Balurghat to Hili of N.F. Railway (Construction).

25/09/2023

09/10/2023

09/10/2023 3:30:00 PM

Nil

CE/CON/MP/PMS/2023/04

Appointment of Project Management Services Agency for Providing Project Management Services for work of Construction of New BG Railway Line Project from Murkongselek station in the state of Assam (Ch: 0.780 Km) to proposed Pasighat station in the state of Arunachal Pradesh (Ch: 27.062 Km) including Electrical (General), Signal and Telecommunication works on Engineering, Procurement & Construction (EPC) Mode.

25/09/2023

09/10/2023

09/10/2023 3:30:00 PM

Nil

CE/CON/KM/MB/2023/09

Construction of Sub-Structure and Super-structure of Major Bridge No. 03 (4x6.1 m PSC Slab at Ch-3.940km), Bridge No. 04 (5x12.2 m PSC Slab at Ch -6.343 km ), Bridge No. 05 (1x12.2 m PSC Slab at Ch - 7.521 km ), Bridge No. 06 (4x6.1 m PSC Slab at Ch-9.769 km), Bridge No. 07 (5x6.1 m PSC Slab at Ch-11.057 km), Bridge No. 08 (3x6.1 m PSC Slab at Ch-12.997 km), Bridge No. 09 (3x12.2 m PSC Slab at Ch -13.836 km ), Bridge No. 10 (3x6.1 m PSC Slab at Ch-15.692 km), Bridge No. 11 (5x6.1 m PSC Slab at Ch-18.962 km), Bridge No. 12 (4x12.2 m PSC Slab at Ch - 18.065 km ), Bridge No. 13 (1x45.7 m OWG at Ch - 18.962 km ), Bridge No. 14 (2x45.7 m OWG at Ch- 20.475 km ), Bridge No. 15 (3x6.1 m PSC Slab at Ch-22.543 km), Bridge No. 16 (8x45.7 m OWG at Ch - 24.299 km), Bridge No. 17 (5x12.2 m PSC Slab at Ch - 26.64 km ), Bridge No. 18 (7x12.2 m PSC Slab at Ch - 27.85 km ), Bridge No. 19 (4x12.2 m PSC Slab at Ch - 29.773 km ), Bridge No. 20 Double track (6x12.2 m PSC Slab at Ch - 31.77 km ), Bridge No. 21 Double track (7x12.2 m PSC Slab at Ch - 33.255 km ) and Bridge No. 144 (1x6.1+3x12.2+1x6.1 m PSC Slab at Ch -35.239km ) between Katihar and Mukuria in connection with Katihar - Mukuria Doubling project of N.F. Railway (Construction).

14/09/2023

05/10/2023

05/10/2023 3:30:00 PM

Nil

CE/CON/NA/PA/2023/05

Construction of New Foot over Bridge at Bongaigaon Staion and extension of Foot over Bridge at Chaprakata station in connection with NBQ-AGT BG Doubling project.

19/09/2023

03/10/2023

03/10/2023 3:30:00 PM

Nil

         

First : Previous [  1 ] Next : Last  

         
 

Powered by WebX