|
|
|
Available Tenders |
|
Search Tenders |
View
Store Tenders |
Corrigendum
|
|
|
|
Please
Click on the Tender No. to see more details. You must login to download the
tenders.
New Users can
Register
here. |
|
Tender No |
Description |
Issue Date |
Receipt of
Offer up to |
Opening Date |
Corrigendum |
CE/CON/AG/MIS/2023/16 |
Construction of Guide bund of Br no 222(5x30.5m, OWG) at km
83.535, guide bund of Br no 247(9x45.7m, OWG) at km 93.585, diversion of Indo Nepal
border road 980m long (approx) along Railway embankment up to Br. No. 250 and other
ancillary works in connection with Araria - Galgalia new BG line project of N. F. Railway. |
06/11/2023 |
06/11/2023
|
06/11/2023 2:30:00 PM |
Nil |
CE/CON/NA/GCA/2023/06 |
Construction of Goods Circulating area, labour shed & goods approach road at Barpeta
Road and other ancillary works in connection with NBQ-AGT BG Doubling project. |
12/10/2023 |
26/10/2023
|
26/10/2023 3:30:00 PM |
Nil |
CE/CON/KM/DDC/SLT/2023/01 |
Name of work - Conducting Geotechnical investigation (along with preparation & submission of final report), developing bridge GADs, designing and developing detailed
structural drawings for foundation,
ubstructure, bearings, pedestal & bed block etc. for major/important bridges, Br. No. 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21 & 144 ( Total = 20 Nos.) along with submitting 5 set of hard copies and editable soft copies (with detailed
design calculations) in connection with doubling work of KIR-MFA section. |
02/10/2023 |
16/10/2023
|
16/10/2023 2:30:00 PM |
Nil |
CE/CON/B-S/PW/2023/04/RT1 |
Protection work of slopes in cutting and other ancilliary work under juridiction of DY.CE/CON/BHRB & DY.CE/CON/KAWNPUI in connection with the construction of
new BG Railway line from Bairabi to Sairang (Mizoram) Project. |
29/09/2023 |
13/10/2023
|
13/10/2023 3:30:00 PM |
Nil |
CE/CON/B-S/MIS/2023/03/RT1 |
Execution of Civil Engineering work for construction of Double storied Service building & maintenance shed for sick line, covered washing pit line shed, cat walk with water hydrant & pathway, Coach watering facility, Track machine staff office cum Rest house & siding Platform including electrical
works at Sairang Yard and Goods office, FOIS, Merchant office & labour Rest Room at Mualkhang & Sairang Yard in connection with Bairabi-Sairang New BG Rail Line Project (Mizoram). |
29/09/2023 |
13/10/2023
|
13/10/2023 3:30:00 PM |
Nil |
CE/CON/JT/PW/2023/05/RT1 |
Protection of high embankment and deep cutting and other ancillary works under the jurisdiction of Dy.CE/CON/JRBM between station JRBM-VNGP-Tunnel No. 1 in connection with construction of new BG Railway line from Jiribam to Tupul (Imphal). |
26/09/2023 |
10/10/2023
|
10/10/2023 3:30:00 PM |
Nil |
CE/CON/AG/PW/2023/15 |
Construction of Guide bund of Br no 166, and other ancillary works in connection with Araria - Galgalia new BG line project of N. F. Railway. |
25/09/2023 |
09/10/2023
|
09/10/2023 3:30:00 PM |
Nil |
CE/CON/BH/MB/2023/10 |
Balance work of Sub-structure and Superstrucure of major Bridge No. 4
(5x45.7 m OWG Through Welded Steel Girder at Ch - 1.385 km ), Bridge No. 16 (4x12.2m
PSC Slab at Ch- 9.53 km ), Bridge No. 20 (3x12.2m Composite Girder at Ch - 14.508 km), Bridge No. 26 (3x12.2 m PSC slab at Ch - 20.185km) and Br No. 36 (3x45.72m OWG
Through Welded Steel Girder at Ch. - 27.93 km) between Balurghat to Hili and other
ancillary works in connection with new BG line project from Balurghat to Hili of N.F.
Railway (Construction). |
25/09/2023 |
09/10/2023
|
09/10/2023 3:30:00 PM |
Nil |
CE/CON/MP/PMS/2023/04 |
Appointment of Project Management Services Agency for Providing Project Management
Services for work of Construction of New BG Railway Line Project from Murkongselek station in the state of Assam (Ch: 0.780 Km) to proposed Pasighat station in the state of Arunachal Pradesh (Ch: 27.062 Km) including Electrical (General), Signal and Telecommunication works on Engineering, Procurement & Construction (EPC) Mode. |
25/09/2023 |
09/10/2023
|
09/10/2023 3:30:00 PM |
Nil |
CE/CON/KM/MB/2023/09 |
Construction of Sub-Structure and Super-structure of Major Bridge No. 03 (4x6.1 m PSC Slab at Ch-3.940km), Bridge No. 04 (5x12.2 m PSC Slab at Ch -6.343 km ), Bridge No. 05 (1x12.2 m PSC Slab at Ch - 7.521 km ), Bridge No. 06 (4x6.1 m PSC Slab at Ch-9.769 km),
Bridge No. 07 (5x6.1 m PSC Slab at Ch-11.057 km), Bridge No. 08 (3x6.1 m PSC Slab at Ch-12.997 km), Bridge No. 09 (3x12.2 m PSC Slab at Ch -13.836 km ), Bridge No. 10 (3x6.1 m PSC Slab at Ch-15.692 km), Bridge No. 11 (5x6.1 m PSC Slab at Ch-18.962 km), Bridge
No. 12 (4x12.2 m PSC Slab at Ch - 18.065 km ), Bridge No. 13 (1x45.7 m OWG at Ch -
18.962 km ), Bridge No. 14 (2x45.7 m OWG at Ch- 20.475 km ), Bridge No. 15 (3x6.1 m
PSC Slab at Ch-22.543 km), Bridge No. 16 (8x45.7 m OWG at Ch - 24.299 km), Bridge No. 17 (5x12.2 m PSC Slab at Ch - 26.64 km ), Bridge No. 18 (7x12.2 m PSC Slab at Ch - 27.85 km ), Bridge No. 19 (4x12.2 m PSC Slab at Ch - 29.773 km ), Bridge No. 20 Double track (6x12.2 m PSC Slab at Ch - 31.77 km ), Bridge No. 21 Double track (7x12.2 m PSC Slab at Ch - 33.255 km ) and Bridge No. 144 (1x6.1+3x12.2+1x6.1 m PSC Slab at Ch -35.239km ) between Katihar and Mukuria in connection with Katihar - Mukuria Doubling project of N.F. Railway (Construction). |
14/09/2023 |
05/10/2023
|
05/10/2023 3:30:00 PM |
Nil |
CE/CON/NA/PA/2023/05 |
Construction of New Foot over Bridge at Bongaigaon Staion and extension of Foot over Bridge at Chaprakata station in connection with NBQ-AGT BG Doubling project. |
19/09/2023 |
03/10/2023
|
03/10/2023 3:30:00 PM |
Nil |
|
|
|
|
|
|
First : Previous [ 1 ] Next : Last |
|
|
|
|
|
|